New Ground Construction.
















































 
22/4/13..Construction begins on the first skeet tower.








Fireplace being installed















Tuesday 16th April the frames for the skeet houses which had been premade and stored at John & Alan Beavers,were transported up to the park on John & Alans truck,as it was a wide load Lindsay escorted it.Bob,Brendan,David & Warwick also assisted,and got absolutely soaked in the pouring rain.
April 16th 2013
April 16th 2013
Skeet tower frames arrive at the club on Beavers truck,wide load escorted by Lindsay.And yes it is raining hard.
April 16th 2013
Skeet tower frames arrive at the club on Beavers truck,wide load escorted by Lindsay.
April 16th 2013
April 16th 2013
April 16th 2013
Skeet tower frames arrive at the club on Beavers truck,wide load escorted by Lindsay.
April 16th 2013
Unloading the frames in the pouring rain.
April 16th 2013
April 16th 2013
April 16th 2013
Skeet tower frames stacked on the drive
April 16th 2013
Skeet tower frames stacked on the drive
April 16th 2013










Grass seed is starting to spring up around the trap fields












Selwyn has finished painting the inside of the club house extension















Fireplace is nearly ready,tiling is done.
We will need firewood chopping shortly.















All traphouses now have safety flags



 

 



15/2/13 New water tank arrives..







18/1/13
18/1/13
The rail wagon from Kaitemako Rd has now been settled on its foundation down the far end of the ground for sporting clays storage.
18/1/13
The rail wagon from Kaitemako Rd has now been settled on its foundation down the far end of the ground for sporting clays storage.
18/1/13
18/1/13
18/1/13
The rail wagon from Kaitemako Rd has now been settled on its foundation down the far end of the ground for sporting clays storage.
18/1/13
The rail wagon from Kaitemako Rd has now been settled on its foundation down the far end of the ground for sporting clays storage.
18/1/13











23/12/12....Metal laid between the lanes on Trap No3,and topsoil in between the gymcrack lanes.
Thank you to Arthur Fulton from Fulton Hogan for the metal and the Beavers for carting it up to the club.































TECT Park Update 14/12/12
TECT Park Update 14/12/12
Still lots of workbeing done at the grounds,infill on the trap 4 lanes is done and ready for concrete.
TECT Park Update 14/12/12
Trap 4 is ready,just waiting for the electrican to wire it up.
TECT Park Update 14/12/12
TECT Park Update 14/12/12
TECT Park Update 14/12/12
Grass is growing well,the fertiliser has worked wonders.
TECT Park Update 14/12/12
Grass is growing well,the fertiliser has worked wonders.
TECT Park Update 14/12/12
TECT Park Update 14/12/12
TECT Park Update 14/12/12
Grass is growing well,the fertiliser has worked wonders.
TECT Park Update 14/12/12
Grass is growing well,the fertiliser has worked wonders.
TECT Park Update 14/12/12
16/12/12
16/12/12
The grass gets its first mow
16/12/12
The grass gets its first mow
16/12/12
The green,green grass has grown,looks like we might need a haybaler...




















Colin and Tom have done so much in the last few weeks,true tradesmen,they have been working on the decking around the office,Bob has been putting up partitions in the toilets,Grant has got trap 4 ready for concrete,all trap house block work is finished and the grass is on the move after the fertiliser was spread,Selwyn has painted the office and the toilets,electrician has wired trap 4 and lights in the office and toilets all go.


Nov 14-2012
Nov 14-2012
Decking out the back of the office.
Nov 14-2012
Blocks laid for skeet house foundations
Nov 14-2012
Nov 14-2012
Nov 14-2012
Selwyn painter extrodinaire.Selwyn has done a massive job painting the clubhouse outside and in.Thanks heaps.
Nov 14-2012
Colin on the nail gun.Colin has been camping up at the grounds and working on the clubhouse.
Nov 14-2012
Nov 14-2012
Nov 14-2012
Tom at work on the deck around the office.
Nov 14-2012
Bob being the builder,working on the partitions in the toilets.
Nov 14-2012








Nov 12th...John,Allan, and Tony Beaver trucked up and spread a load of fertiliser donated by Balance at the Mount.
Hopefully to kick start the grass.
Lawn mowing roster will be out shortly.
Gib stopping is done and Selwyn is busy painting again.












 

Nov 2012
Nov 2012
Ray tidying up the kitchen.
Nov 2012
The fence around the containers.
Nov 2012
Nov 2012
Nov 2012
Boxing for concrete going in between the lanes
Nov 2012
Skeet house foundations
Nov 2012
Nov 2012
Nov 2012
Skeet house foundations with concrete
Nov 2012
Gib board inside
Nov 2012
 Nov 2012
Nov 2012
Colin camped out tp help.
Nov 2012
Nov 2012
Nov 2012
Nov 2012
Gib stopping
Nov 2012
Skeet fields under way.
Nov 2012
Nov 2012
Nov 2012
Metal from Doug Gerrand for carpark.
Nov 2012
Lanes for trap 4
Nov 2012
















November 4th Update.....Major progress in the last 2 weeks,all skeet house foundations have been dug and poured,most skeet pads have been poured,No.3 trap house and lanes have been finished.No4 trap house floor has been laid.Block layers are booked for skeet house bases Wed. of next week.No 4 lanes are boxed ready for poring ..Gib board is all up in the club house,Gib stoppers due Tuesday next week.Fence finished behind containers. 




16 October..Finally some dry weather to get the concrete truck on the grounds,a good turn out of members saw the lanes for trap 3 finished and the floors for traphouses 3 & 4 poured.
The foundations for the first skeet houses have been dug and the gib board for the clubhouse extension walls was unloaded into the clubhouse,a fence is nearly completed from the clubhouse along the back of the containers.
The painting of the clubhouse exterior has been completed by Selwyn Gates.
It looks fantastic and we owe a big thank you to Selwyn for this generous effort to the association.
Thank you also to Pam for the pikelets for morning tea.
Thank you to Tom Gourlay for installing the batts in the clubhouse extension.




Working Bee 17/10/12
Working Bee 17/10/12
Laying concrete trap 3 lane extensions
Working Bee 17/10/12
Floor for trap 3
Working Bee 17/10/12
Working Bee 17/10/12
Working Bee 17/10/12
Nearly a butt crack alert.
Working Bee 17/10/12
Stu and Terry building the fence behind the containers.
Working Bee 17/10/12
Working Bee 17/10/12
Working Bee 17/10/12
Floor for trap 4.
Working Bee 17/10/12
Trap 3 has lanes from 11m to 25m.
Working Bee 17/10/12
Working Bee 17/10/12
Working Bee 17/10/12
David laying concrete under supervision.
Working Bee 17/10/12
Foundation members hard at work.
Working Bee 17/10/12






























August Updates...
Power is getting closer,we have a transformer and the cabling is being laid to connect the trap and skeet houses and the clubhouse.
Transformer is installed alongside the clubhouse.27/8/2012...Brendon Broom photo.


Cable being laid alongside the trap and skeet houses,that will be good,no more generator reqired to run the traphouses.





Power cable going into the clubhouse.27/8/2012...Brendon Broom photo.



The railway wagon from Kaitemako Rd has arrived,its temporarily on blocks until its dry enough to get it onto its foundations down the eastern end of the grounds.After a waterblast,it will be used to store the sporting clays equipment.
Sporting Clays container,tempoariliy on blocks before it gets moved onto its foundations down the eastern end of the grounds.





________________________

Bob working on the foundations for the container from Kaitemako Rd,it will be used for storage of the sporting clay equipment.


July Updates....
BOPCTA End of July Update 2012
BOPCTA End of July Update 2012
Guttering is up on the clubhouse,this will help keep the feild drier as the rain is now going down the drain to the pond and not running over field 3.
BOPCTA End of July Update 2012
We have a metal path from the club house out to the trap fieids,thanks very much to the generosity of Doug Gerrand,who also provided the equipment to spread it out too.Well done,thank you very much.
BOPCTA End of July Update 2012
BOPCTA End of July Update 2012
BOPCTA End of July Update 2012
We have a metal path from the club house out to the trap fieids,thanks very much to the generosity of Doug Gerrand,who also provided the equipment to spread it out too.Well done,thank you very much.
BOPCTA End of July Update 2012
The inside of the clubhouse is all closed in and ready for gib board once it dries out.
BOPCTA End of July Update 2012
BOPCTA End of July Update 2012
BOPCTA End of July Update 2012
The power cable is slowly snaking down the driveway towards the clubhouse.....BBQ days may be coming to an end....

Selwyn has been busy painting the clubhouse.






























June 2012 Updates.
28/6...Cladding is up on the extension and windows are fitted.







27/6..   Terry and Gordon made the building water tight today just a few cosmetic jobs to finish off,well done Guys battling the elements.The electrician began the wiring today pre gib. Gene going well with outside facia.
A very good turn out for afternoon practice, Thank you Ben Tuck and Stu Clarke for coaching and trap setting.
Good turn out to practise...even though it was freezing cold.













Extensions nearly closed in now.


















Roofings on,walls getting cladded.....not far from finished now.




22/6...  Terry,Ants, and Gordon from Mount  Roofing have started on a total re-roof hopefully to finish mid next week?.Looking good.





































You need Flash Player in order to view this.
TECT All Terrain Park Pt3 Apr12
Promotional Video for TECT Park,the Clay Target Club is featured from about half way through.
15/6...The foundations for traps 3 & 4 are ready....Thanks to Mark & Bob.
Foundations are dug for traps 3 & 4...Thanks Bob and Mark.













The lanes on trap 3 are boxed and ready to be extended forwards to 11m......no reflection on the standard of the shooting at the last shoot.
Lane 3 has been extended forward.







The roof on the veranda and the extension are finished and ready for the roofing iron to go on.
The roof on the veranda and the extensions are finished ready for the roofing iron to go on.And thanks to Pam and Tom for giving the inside of the club house a spring clean.

13/6..Gates are up at the entrance to the grounds,thanks Lindsay.
And Stu has been grinding the extension floors so we can have a nice exposed aggregate finish.
Gates at the entrance,thanks to Lindsay......



Stu grinding the concrete floors.





Stu grinding the concrete floors.


9/6..Roof beams for the veranda are up.
Roof beams for the veranda are up......Brendon Broom photo.



7/6...Posts to support deck roof fitted today.The tall ones each end are for flood lights for night shoots.
Posts to support deck roof fitted today.The tall ones each end are for flood lights for night shoots.










May 2012 Update.
31/5/12..Work continues on the clubhouse extension roof,the boxing has been removed from Trap 3 lanes and traps have been installed on Traps 1 & 2.









Bob Sadd, Mark Walsh and Ross Ellis installed traps 1 and 2 .Brendon Broom photo.










 Gene Holland fixing facia to club room extension.Brendon Broom photo.








Darrel Crawford de boxing lanes on trap 3 layout. Brendon Broom photo.





25/5...Friday saw the trap lanes poured on no3 layout. Thank you to the following members who gave their time and expertise.Grant Castles,Mark Walsh,Ian Crowe, Bob Sadd,Ross Ellis, David Parkinson, Tom Verran,Darrell Crawford,Mark "Bloke" and Hank.





24/5...2 trap houses complete.
Brian and Bevan from Page and Macrae delivered and fitted lids to number 1 and 2 trap houses,also modified and fitted gate for tractor shed,a very profesional job.Well done.






















23/5...Roof trusses are up on the clubhouse extensions.
Lanes for Trap 3 are layed out and boxed ready for concrete.
Roof trusses on the clubhouse extension...Brendon Broom photo












Boxing layed out for Trap 3,awaiting concrete....Brendon Broom photo. 21/5..Walls for traphouse 2 poured,high skeet tower pad on field 1 poured and the lanes on field 2 have been concreted bewteen the 15 and 17m marks so you can change lanes walking on concrete.The roof trusses for the clubhouse extension arrived and are ready to go this week.The boxing is layed out for feild 3 lanes.
Walls have gone up on the clubhouse extensions,and gates are up at the southern entrance to the grounds.
Roof trusses for the clubhouse extensions being unloaded...Brendon Broom photo.



Pumping concrete into the clubhouse extension..Brendon Broom photo.

TECT Park..Extensions to clubhouse Bay of Plenty Clay Target...Brendon Broom photo.


TECT Park..Extensions to clubhouse Bay of Plenty Clay Target...Brendon Broom photo.
Walls going up for the office.....Brendon Broom PhotoFloor for the office....Brendon Broom Photo



Office floor.Brendon Broom Photo 
 

Walls going up on the clubhouse extensions.Brendon Broom Photo
Last one out close the gates...Brendon Broom Photo
Update for 28/4/12,a selection of photos showing the trap house construction,extension to the club house and the earthworks.
 
TECT Park Update 28/4/12
TECT Park Update 28/4/12
Truck load of sand arrives
TECT Park Update 28/4/12
Bulldozer finishing up the earthworks
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
Re instating the topsoil
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
View of the contouring
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
Trap house foundations
TECT Park Update 28/4/12
Concrete pumping
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
Floor going down on the clubhouse extension.
TECT Park Update 28/4/12
Floor going down on the clubhouse extension.
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
Floor going down on the clubhouse extension.
TECT Park Update 28/4/12
Floor going down on the clubhouse extension.
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
Topsoil going back in between the lanes
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
Trap house walls being poured
TECT Park Update 28/4/12
Trap house walls being poured
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
Trap house walls being poured
TECT Park Update 28/4/12
Trap house walls being poured
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
Trap house walls being poured
TECT Park Update 28/4/12
Trap house walls being poured
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
TECT Park Update 28/4/12
 
















Update 20/4/12...Floors for 2 traphouses have been poured and on the lanes between the 15 & 17m mark has been infilled so you can change lanes by walking on concrete.
Update 6/4/12
Update 6/4/12
Topsoil being spread back across the top of the new grounds
Update 6/4/12
The earthmoving has finished,now the topsoil is being spread back over the grounds.
Update 6/4/12
Update 6/4/12
Update 6/4/12
Ross harrowing the grounds in preparation for sowing the grass seed.
Update 6/4/12
Theres a lot of grounds to harrow! Thank you to all the volunteers who came up and picked up sticks.
Update 6/4/12
Update 6/4/12
Update 6/4/12
Stu planting the grass seed.Now we need a little bit of rain to get it growing.
Update 6/4/12
Work continues on the extensions to the clubhouse
Update 6/4/12
Update 6/4/12
Update 6/4/12
Topsoil being carted upfrom the bottom of the grounds by Aidans tractor.
Update 6/4/12
The grounds looking back from the eastern end.
Update 6/4/12
Update 6/4/12
Update 6/4/12
The grounds looking back from the eastern end.






The concrete has been poured for the lanes on Trap No1 21/02/12.
Bay of Plenty Clay Target 13/3/12
Bay of Plenty Clay Target 13/3/12
Trap Field 1 & 2
Bay of Plenty Clay Target 13/3/12
Boxing layed out for Trap Field 2
Bay of Plenty Clay Target 13/3/12
Bay of Plenty Clay Target 13/3/12
Bay of Plenty Clay Target 13/3/12
The containers have arrived at the grounds.
Bay of Plenty Clay Target 13/3/12
The clubhouse with the new deck,roof will go on shortly.
Bay of Plenty Clay Target 13/3/12
Bay of Plenty Clay Target 13/3/12
Bay of Plenty Clay Target 13/3/12
Containers and clubhouse.
Bay of Plenty Clay Target 13/3/12
Clubhouse and deck
Bay of Plenty Clay Target 13/3/12
Bay of Plenty Clay Target 13/3/12
Bay of Plenty Clay Target 13/3/12
on the new deck
Bay of Plenty Clay Target 13/3/12
Work is starting on the new toilet/office extension to the clubhouse.
Bay of Plenty Clay Target 13/3/12
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
TECT ParkNew Deck being built on the club house.
Bay of Plenty Clay Target Association
TECT Park Trap 1 lanes with the traphouse framed up behind.
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Concrete being laid one the first trap feild at the new grounds at TECT Park 21/2/12
Bay of Plenty Clay Target Association
Concrete being laid one the first trap feild at the new grounds at TECT Park 21/2/12
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Lunch time
Bay of Plenty Clay Target Association
A sunshower passes through
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Lanes for Trap 1 finished 21/2/12
Bay of Plenty Clay Target Association
TECT Park Lindsay...Fencer Extrodinaire.
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
TECT Park New Deck going on the club house
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
TECT Park It appears to rain here ocasionally!!!.
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
TECT Park Clubhouse at the new grounds.
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
TECT Park Drainage going in
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
TECT Park Drains being layed.
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
TECT Park Sumps going in.
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
TECT Park Sumps going in.
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
TECT Park Metal for the road base being dug.
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
TECT Park
Bay of Plenty Clay Target Association
TECT Park The metal boxing for the trap lanes.Thank you Tiggy and Page & McRae.
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Club House arrives at TECT Park
Bay of Plenty Clay Target Association
Club House arrives at TECT Park
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Club House arrives at TECT Park
Bay of Plenty Clay Target Association
Club House arrives at TECT Park
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Bay of Plenty Clay Target Association
Club House arrives at TECT Park
Bay of Plenty Clay Target Association
Club House arrives at TECT Park
Bay of Plenty Clay Target Association






























 
You need Flash Player in order to view this.
A Peek at TECT ALL-TERRAIN PARK, Pyes Pa, New Zealand as at 8 Feb 2012
Councillors of Tauranga City Council and Western Bay of Plenty District Council as available inspect with staff progress at TECT All Terrain Park, Pyes Pa.l










Serious progress now being made,fences going up,drains ready to lay,end in sight for the earthworks.
Volunteers...The Club is nearly ready to start doing all the jobs we need your help with.
Club members,family,friends or anyone who is willing to help is welcome.











17/12 Latest Update...heavy rain this week has brought all earthworks to a stop...it is so wet that its going to need some time to dry out,the bulldozers go on holiday next week and work wont start again until January 9th...weather permitting of course.
The shifting of the clubhouse has also been put back until Feb 13th...as...due to the wet weather we've got nowhere to put it.
Surveying has revealled TECT Park is at a higher elevation than the top of the Kaimai Rd.

December update,photos below show the perimeter track being formed by Aidan in the digger.As soon as its finished fencing can start.





A set of steel boxing formers are being 
The skeet houses have been fabricated off site and are ready to be moved up to the park as soon as the bases are poured.
Fencing is ready to go as soon as the bulldozer completes a track around the edges of the site for the perimeter fence.
Expect to be notified over the next couple of weeks when we will need workers on site at the park to help with the construction work.
Work has started prefabricating the
up to TECT Park when the earthworks
Plans for the additions to the clubhouse
The issue of getting power in appears
turn so were connected by the time were

 
TECT All Terrain Park was signed in late 
of 3m high pine trees into a National quality 
clearing tracks around the site boundaries,
Then a mulching machine was bought in to 
The bulldozers arrived early 2011 and the 
was no rock under the surface where the 
soil is largely clay,and when it rains work 
traction.As at May 2011 siteworks have 
and work will resume when the dry weather 
 We have also been successful with a grant from TECT Trust and have funding in place to shift the club house from the Tauranga club grounds to TECT All Terrain Park,refurbish it and add an office and toilet block.
Earthworks Contractor...



 
 

TECTAll Terrain Park
TECTAll Terrain Park
TECT Park 2010
TECT Park 2010
'Your going to build a gun club here?"
TECT Park 2010
TECT Park 2010
Murray looking for a gun club!!
TECT Park 2010
TECT Park 2010
Grant sets forth into the wilderness...which eventually will become the trapline.
TECT Park 2010
TECT Park 2010
You can't see the new gun club for the trees
TECT Park 2010
TECT Park 2010
The mulcher made quick work of the trees.
TECT Park Feb 2011
TECT Park Feb 2011
Earthmoving starts
TECT Park Feb 2011
TECT Park Feb 2011
This has to be levelled out!!
TECT Park Feb 2011
TECT Park Feb 2011
Higgins bulldozer and Carryall at work
TECT Park Feb 2011
TECT Park Feb 2011
Thats a big hole to fill
TECT Park Feb 2011
TECT Park Feb 2011
Trapline starting to take shape
TECT Park Feb 2011
TECT Park Feb 2011
Trapline starting to take shape
TECT Park Feb 2011
TECT Park Feb 2011
Trapline starting to take shape
TECT Park Feb 2011
TECT Park Feb 2011
Big boys toys.
TECT Park Feb 2011
TECT Park Feb 2011
Dirt shifting too fill the big hole
TECT Park Mar 2011
TECT Park Mar 2011
Rain stops play
TECT Park Mar 2011
TECT Park Mar 2011
Rain stops play
TECT Park Mar 2011
TECT Park Mar 2011
Moving dirt again,but the ground is soggy
TECT Park Mar 2011
TECT Park Mar 2011
Machines sure beat a working bee with wheelbarrows.
TECT Park Mar 2011
TECT Park Mar 2011
Digger loading the carryall as it gets wetter
TECT Park Mar 2011
TECT Park Mar 2011
Digger loading the carryall as it gets wetter
TECT Park Mar 2011
TECT Park Mar 2011
On site consultation
TECT Park Mar 2011
TECT Park Mar 2011
The President Presiding over all he surveys.
TECT Park Mar 2011
TECT Park Mar 2011
Trapline looking back to where the club house will be
TECT Park Mar 2011
TECT Park Mar 2011
Looking from the trapline down to the silt ponds
TECT Park Mar 2011
TECT Park Mar 2011
Looking back along the trapline,the wet ground starting to get boggy
TECT Park Mar 2011
TECT Park Mar 2011
An idea of the contours and the dirt that needs shifting
TECT Park April 2011
TECT Park April 2011
Things starting to take a definite shape now
TECT Park April 2011
TECT Park April 2011
Looking back along the trapline towards the clubhouse site,gives an idea how long it will be
TECT Park April 2011
TECT Park April 2011
From the clubhouse end lookimg back down the trapline
TECT Park April 2011
TECT Park April 2011
Another view back down the trapline towards the clubhouse end.Don't forget your score sheet because its a long walk back to get it!!
TECT Park April 2011
TECT Park April 2011
Looking more like a gun club now,however the ground is soaked and the bulldozers have parked up until spring.
TECT Park 2nd June 2011
TECT Park 2nd June 2011
Aidan spreading grass seed
TECT Park 2nd June 2011
TECT Park 2nd June 2011
Big tyres are a help when the ground is really wet
TECT Park 2nd June 2011
TECT Park 2nd June 2011
And when you get stuck its handy to have a bulldozer around
TECT Park 2nd June 2011
TECT Park 2nd June 2011
Looking from the southern end of the trap line back towards the north. Gives you an idea of where things should finish up,there will be 2 more trap & skeet feilds on the far side of the club house.2 more feilds will be added to each side eventually giving 8 fields.
TECT Park 2nd June 2011
TECT Park 2nd June 2011
Mulching over the grass seed
TECT Park 2nd June 2011
TECT Park 2nd June 2011
Mulching over the grass seed
TECT Park 2nd June 2011
TECT Park 2nd June 2011
Mulching over the grass seed